Not much commentary this week. Just look at the captions under the pictures for a description of where the picture is taken and what is going on!
|
At the end of the upper lobby (Upper Commons) next to the Ministry Center building. Light fixtures are really starting to light up the place!
|
|
View from the stage in the Youth Assembly Room, a.k.a. The Pit, looking out towards the rest of the room.
|
|
The stage area in the Youth Assembly Room, a.k.a.The Pit.
|
|
Upper lobby (Upper Commons)
|
|
At rear of worship space under the balcony. The ceiling has been filled in and is being smoothed out.
|
These are test areas for floor colors on the concrete floor in The Pit.
|
Lights are being added in the main lobby. Maybe a "lit up" picture next week!
|
|
Elevator under construction. You are looking at the floor of the elevator car.
|
|
It takes a lot of "behind the scenes" stuff to make everything work. This is a storage/mechanical/electrical area in the lower level now fully lit up.
A huge amount of work is happening in the worship space.
This picture of the worship space shows the choir risers on the sides of the chancel and the "preaching" space at the front of the chancel outlined in red.
|
|
This picture has the choir risers and preaching platform outlined. The framing of these features is underway.
|
|
This view shows the framing for the choir risers on one side of the chancel.
|
|
And clearing on the parking lot across the street is almost complete, and grading has started.
|