But here's a look at some major items:
Windows......
Window frames are being installed in the upper openings of the worship center space.
And if you don't think you see glass, you are not going crazy (well, at least most of you aren't!). The glass will be installed later when the chance for breakage is less.
Roof....
The roof now has shingles that match the shingles that were installed earlier this year on the outer edges of the Children's Building roof.
Addition of the roof tiles also greatly reduces the amount of water seeping inside the building during a rainstorm! This has been a big nuisance!
Workers are working on the Ministry Center roof to tie it in with the new Worship Center roof.
Walls (Inside and Out)
And outside, work is nearly complete on the upper sections of wall that are receiving a colored coating.
Foundation walls facing the parking lot are getting their facing of stone or brick (see below).
And up on the "dance floor" high above the worship seating space...
And remember: the wooden floor this man is standing on is level with the seats in the balcony. He is halfway between the concrete floor on the main seating floor and the bottom of the roof trusses shown in the top of this picture!
And last but not least! I don't know his name, but he gave me great smile and a great pose when he saw that I was taking pictures. So I told him that I was going to put him on the Internet!!!
This comment has been removed by a blog administrator.