A couple of new things......
.......Bricks!
........Heating and air conditioning equipment.
What is peeking out from under the black plastic tarp is HVAC ductwork.
........And the boxes hanging from the ceiling with blue plastic on them are parts of the heating and air conditioning system.
This is a little different look at the interior of the worship space. This photo was taken at night. No, those are not permanent lights! They are temporary construction lights in the ceiling.
Work has being going on for several weeks in preparation to pouring the concrete floors in the lower level. A portion of the floor has been poured, but rain keeps disrupting the process. If luck holds out, however, this Saturday, August 25, a major concrete pour will happen, and a portion of the floor from the back wall to the front of the building will be poured. Just in time for Rally Day!
This photo was take on top of the roof looking through the skylight opening into the main first floor lobby. The areas covered in white have been prepared for the concrete pour for the floor.
Hopefully you have heard that the ceiling in the worship space will be wood. The panels in this picture are samples of the color and style of the wood ceiling.
No comments:
Post a Comment